Precision Hermiston ConcretePrecision Hermiston Concrete

Concrete parking lot building in Hermiston OR - planned for trucks and people on foot

Ruts, puddles and patched asphalt? We lay out the drives and walkways first, then pour concrete built for the traffic it gets.

Rectangular backyard swimming pool bordered by tan pavers, with dark lounge chairs and a tall wooden privacy fence.
  • Licensed and insured.
  • Free in-person estimates.
  • We respond within 1 business day.

What building a concrete parking lot involves

At Precision Hermiston Concrete, concrete parking lot building means we lay out, prep and pour a paved lot for your Hermiston property, sized for the cars, delivery trucks and people on foot that use it every day. Most of the work happens before the pour, in the layout and the ground underneath.

You might be putting up a shop or apartments that need parking, or you're done grading a gravel lot that ruts and holds water. The price moves with the lot's size, how much of it carries heavy trucks, how much digging and base the ground needs, and where the water has to go, while the schedule turns on permits and city review, the weather on pour days and the cure before anyone parks. We handle the permits and city paperwork our part of the job calls for, and the estimate is where I measure your lot and write up what it needs.

  • I write your estimate myself

    I come out, walk the site, measure it and write the estimate myself. I also run the job on site, so the person who planned your lot is there the day it's poured.

  • Built right underneath

    I care most about the parts you can't see once it's poured, the base, the joints and the cure, because that's what you park on and live with for years.

  • Licensed and insured in Oregon

    Oregon's Construction Contractors Board licenses contractors and investigates complaints against them. We're licensed and insured, so if something went wrong you'd have a state board to take it to, not just my word.

How we plan and pour a parking lot

Before anyone talks about concrete, I ask where the trucks, the heavy drives and the dumpster go, and where people will be walking, and we lay the lot out around those answers. Next we check where the water runs, so the lot sheds it away from buildings and doors instead of pooling against them. Our crew digs out the subgrade, the ground the slab sits on, and packs a base over it, because a base that's only raked level settles with the dirt and takes the concrete with it. We pour and give it a broom finish, a light ridged texture for grip, then cut control joints on time, shallow cuts that give the slab a straight place to crack, so the cracks land where we chose. Last comes the cure, the wait while the concrete gains strength before cars roll on it. If the budget gets tight, I'd rather keep the base and go plainer on the finish, because nobody sees the base on day one but you park on it for years.

Some lots need more than paving. Light poles, signs and dumpster enclosures sit on concrete footings we pour before the lot goes in, and if the building the lot meets has settled, foundation raising brings it back to level first so the slab and the doorways line up.

What your lot has to handle

Drives that carry heavy trucks

Most lots include driveways, and some of them carry delivery trucks or heavier loads. Tell us which drives see that traffic, so those sections get designed for the weight, not the average car.

Dumpster access and trash pickup

The dumpster spot and the drive a garbage truck uses to reach it may need special consideration in the design, so we bring up dumpster access early, before the layout is set.

Customer and tenant parking

Shop, office and apartment lots see cars turning, backing and parking all day. We set the stalls and aisles around how people really come and go, not a drawing that ignores the door.

Replacing worn gravel or asphalt

If your lot ruts, holds water or needs patching every year, we look at the ground and drainage under it first, because a new surface over the same problem fails the same way.

Get your lot estimate written on site

Send the form and we'll get back to you within one business day. I come out, walk the lot, measure it and write up what it needs, free and with no pressure to book.

  • Mark the heavy-load areas

    Note which drives will see delivery trucks or heavy equipment, and where a dumpster goes, so I show up ready to look hard at the spots that shape the design.

  • Say where people walk

    Tell us where customers or tenants walk from their cars to the door. Those walking routes shape the layout as much as the parking stalls do.

  • Lots outside Hermiston too

    We're based in Hermiston and also work in Umatilla, Pendleton, Kennewick and other cities around the area, so tell us where your lot is.

(458) 219-6758

Questions about concrete parking lots in Hermiston

Straight answers to what property owners ask before a lot goes in, from upkeep and cost to permits and timing.

How long does a concrete parking lot last, and how much upkeep does it need?

Industry guidance says a concrete lot built with methods suited to parking lots can be an economical lot that serves for many years with little maintenance. The key word is built. That's why I put the time into the base, the drainage and the joints, because those are the parts that decide how a lot ages.

How much does a concrete parking lot cost in Hermiston?

There's no honest number until I've seen the site, because the price turns on the lot's size, how many drives need to carry heavy trucks, how much digging and base the ground needs, and where the water has to go. Tearing out old pavement adds to it. I'll measure and write up what your lot needs when I come out for the estimate.

What should a parking lot design include for people walking?

Industry guidance says a lot design should reflect pedestrian safety, including crosswalks, a slip-resistant surface texture and lighting for nighttime. Ask to see those features in the plan before work begins. On our end, we mark the walking routes on the layout early, so crosswalks land where people actually cross.

When do you pour concrete in hot weather, and how long does it cure?

Industry guidance is to place and finish concrete outside the hottest part of the day when possible, so on hot days expect our crew's hours to follow that. The same guidance says to start curing as soon as finishing is done and keep it going for at least 3 days, so plan the lot's opening around those days.

Do I need a stormwater permit to build a parking lot in Oregon?

You do if stormwater from the construction leaves the site through a point source, a single outlet like a pipe or ditch, and reaches surface waters directly or through storm drains. That rule comes from Oregon's Department of Environmental Quality. Under that permit, concrete, mix and wash water stay off the ground, so ask us where ours will go.

Does the City of Hermiston review parking lot plans?

Yes, the city's planning staff review all site plans for commercial, industrial and multi-family residential development, and they recommend talking with staff at the planning office before you submit an application. If your lot is in another city and the paperwork isn't clear cut, we check with the office that issues permits there before we start.

Call before your site plan is set

Call (458) 219-6758 or send the form before your layout is final, so the drives, walkways and drainage get planned together.

(458) 219-6758Request an estimate