Precision Hermiston ConcretePrecision Hermiston Concrete

Concrete footings in Hermiston OR - sized to your soil so what you build stays level

Planning a garage, carport or addition and not sure what the ground will hold? We size and pour footings that carry the load.

Concrete pool deck with geometric gray paving around a blue swimming pool, lounge chairs and outdoor seating.
  • Licensed and insured.
  • Free in-person estimates.
  • We respond within 1 business day.

What goes into a footing job in Hermiston

Concrete footings in Hermiston are the concrete in the ground under your walls or posts that spreads their weight into the soil. We dig the trench, set forms where they're needed, add steel reinforcing and pour, with the width set by how much weight your soil can carry.

Most footing calls I get are for a new garage, shop, carport or addition, or for posts under a deck or patio cover. The price moves with how long and how deep the footings run and what the site's like once we dig, and the schedule moves with the season and the city's steps before work starts. In Hermiston, the city's planning office does a zoning review before a structural permit is issued, and the city wants a Blowing Dust Control Plan in place before anyone breaks ground, naming someone it can reach around the clock. We handle the permits and paperwork our part of the job calls for, so nobody gets a surprise halfway through, and when I walk the lot the estimate spells out what your footings need.

  • Learned on a city crew

    I learned concrete pouring curb and sidewalk that a public inspector had to pass before it counted. I started this business in Hermiston in 2017, and I still run the jobs myself.

  • Licensed and insured

    Oregon generally requires anyone paid for construction work on land and buildings to hold a license. We're licensed and insured, so you aren't carrying that risk yourself when we're on your property.

  • Care for what gets buried

    I care most about the parts you can't see once it's poured, like the trench, the steel and the cure, because that's what your garage or addition rests on for years.

How we dig, form and pour footings

I start by walking the lot and looking at the soil, because a footing is sized to the ground it sits on and I won't pick a width before I know what's under it. Then we stake out the lines, dig the trench down to firm, undisturbed ground and clear out the loose dirt, since a footing poured on loose fill settles right along with it. We set forms where the trench walls won't hold a clean edge, tie in rebar, the steel bars that help the concrete carry weight without pulling apart, and pour and finish the top flat so the wall or posts sit square on it. The concrete then cures, which is the stretch where it sits undisturbed and gains strength, before anything gets built on it. If the budget has to give somewhere, the trench is the last place I'd cut, because nobody sees it after the pour and everything you build depends on it.

Footings sometimes come up next to other work. If an older footing or slab has already sunk, foundation raising can lift what's there, and I'll tell you plainly if that makes more sense than tearing it out. When a new footing has to tie into an existing slab or wall, we use concrete cutting to open a clean edge instead of breaking the old concrete out by hand.

What we pour footings for

Garage and shop walls

A garage or shop wall sits on a continuous strip footing that runs its full length, so the whole wall is carried evenly by the ground instead of at a few points.

Carports and patio covers

Carports and covers rest on posts, and each post needs its own footing under it. We lay them out to the plans so the builder's posts land right where they belong.

Deck and porch posts

One design for post footings pours a wide pad at the bottom of the hole with a narrower pier up to the post. It uses less concrete and works best for deep footings.

Additions and new buildings

An addition puts new weight beside your house, so its footings are sized to that soil and that load. For a whole new building, our foundation installation work starts the same way.

Get a footing estimate for your lot

Send your address, what you plan to build and its size in square feet. We get back to you within one business day, and I come out to walk the lot and write the estimate myself.

  • Free and done on site

    The estimate costs nothing. I measure the job, look at the ground and write up what the footings need, because that's where an honest number for your lot comes from.

  • No pressure to book

    You get the estimate and decide on your own time. If you're comparing bids, ask each contractor how they'll size the footings and what they'll do about the soil.

  • Hermiston and nearby cities

    We're based in Hermiston and also pour footings in Umatilla, Pendleton, Kennewick and other cities around the area, where the permit steps can differ from here.

(458) 219-6758

Footing questions we hear in Hermiston

These are the questions people ask me about cost, permits, soil and winter pours before they build a garage, shop or addition.

How much do concrete footings cost in Hermiston?

Installed residential strip footings, the continuous kind under a wall, usually cost about $5 to $19 per linear foot across the US, based on 2026 figures. Where yours lands depends on how long and deep they run and what the site's like. I measure and look at the ground when I come out, and the estimate is free.

Do I need a permit for concrete footings in Hermiston?

Hermiston's permit list names new carports, garages and patio covers over 200 square feet, not footings on their own, so a footing-only job is a question for the city. If your footings carry one of those structures, it needs a structural permit. The Building Department takes questions at (541) 667-5025, option 2, and we check with the city before we start when a job isn't clear cut.

Will my lot need a soil test before footings are poured?

It can, if soil data shows ground that swells, compresses or shifts is likely on your lot. Under the state's home building code, the building official then decides whether to require a test, and that test may come before the footings are sized. The soil named for Hermiston is deep, well-drained silt laid down by streams, found on stream bottoms and low terraces.

Can concrete footings be poured in winter in Hermiston?

Yes, as long as the concrete materials, the steel, the forms and the ground the concrete touches are free of ice, snow and frost. In winter we wait for clear ground and forms before we pour, so a cold stretch can push your date back. If you're planning a winter build, call early so there's room to work around the weather.

How deep do footings need to go in Hermiston?

Footings need to sit below the frost line, the depth where the ground freezes, and that depth is set for your specific site. The state's Oregon Design Criteria Hub is a map that shows frost depth and other design criteria by location for houses built under the state's residential code. The soil and the load above also shape what the footing needs.

Can I pour my own footings in Hermiston?

You can, and Hermiston homeowners who do their own work, or take out a building permit in their own name, submit a Property Owner Statement to the city. If you'd rather hand it off, I'll walk the lot and tell you straight what the footings need, without selling you anything extra.

Tell us what you're building and where

Call (458) 219-6758 or send the form with your address and plan, since footings go in first and everything after waits on them.

(458) 219-6758Request an estimate